Wind farms
Curiscao Fase II (Spain)| Curiscao Fase II (Spain) |
|
| Operational (6,8 MW) |

| Country | Spain |
| County/Zone | Asturias |
| City | Salas - Valdes |
| Wind farm type | Onshore wind farm |

![]() | 6.8 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G52/850 (x 8) |

| No source available |

| Coordonnées | Latitude 43° 28' 16.2" - Longitude -6° 18' 32.3" |
| Localisation précise | Oui |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Curiscao Fase I (0 km) Baos y Pumar Fase I (5 km) Baos y Pumar Fase II (5 km) Sierra de Bodenaya (8 km) Pico Gallo (11 km) Sierra de Tineo (16 km) Belmonte (19 km) Verdigueiro (23 km) Capiechamartin (24 km) Peña del Cuervo (25 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Asturias : 698.1 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 21 janvier 2025 |
||