Wind farms
Vänervind (Sweden)| Vänervind (Sweden) |
|
| Operational (8,35 MW) |

| Country | Sweden |
| County/Zone | Västra Götaland |
| City | Mellerud |
| Wind farm type | Onshore wind farm |

![]() | 0.85 MW commissioned |
![]() | 7.5 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Kenersys K100 (x 3) |
| Operational | Vestas V52/850 (x 1) |

| No source available |

| City | Mellerud |
| Commissioning | ![]() |
| Turbines | 3x Kenersys K100 (power 2,500 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 7,500 kW |
| Status | Operational |
| Développeur | ![]() |
| Coordonnées | Latitude 58° 41' 58.9" - Longitude 12° 27' 45" |
| Altitude | 66 m |
| Localisation précise | Non |
| City | Mellerud |
| Commissioning | ![]() |
| Turbine | 1x Vestas V52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 850 kW |
| Status | Operational |
| Développeur | ![]() |
| Coordonnées | Latitude 58° 41' 58.9" - Longitude 12° 27' 45" |
| Altitude | 65 m |
| Localisation précise | Non |
Bases de données ![]() Sweden (95.5 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Allerud (0 km) Qvantenburg 2 (0 km) Järns-Bön (0 km) Grinstads-Hagen 2 öst (0 km) Karlsfält (0 km) Grinstads-Hagen 1 (0 km) Erikstads-Mossebol 2 (0 km) Brändekulla-Sunnana (0 km) Nordkärrshögar (0 km) Vena (0 km) | ||
|
Insights Puissance installée Sweden : 18 515.0 MW (fin 2025) Västra Götaland : 1 482.2 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 8 septembre 2025 |
||