Wind farms
Cortijo La Linera (Spain)| Cortijo La Linera (Spain) |
|
| Operational (28 MW) |

| Country | Spain |
| County/Zone | Málaga (Andalucía) |
| City | Campillos - Teba |
| Wind farm type | Onshore wind farm |

![]() | 26 MW commissioned |
![]() | 2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G90/2000 (x 13) |
| Operational | Gamesa G87/2000 (x 1) |

| No source available |

| City | Campillos, Teba |
| Commissioning | ![]() |
| Turbines | 13x Gamesa G90/2000 (power 2,000 kW, diameter 90 m) |
| Total nominal power | 26,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Coordonnées | Latitude 37° 2' 43.4" - Longitude -4° 51' 41.4" |
| Localisation précise | Non |
| City | Campillos, Teba |
| Commissioning | ![]() |
| Turbine | 1x Gamesa G87/2000 (power 2,000 kW, diameter 87 m) |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Coordonnées | Latitude 37° 2' 43.4" - Longitude -4° 51' 41.4" |
| Localisation précise | Non |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins La Cuesta (0 km) Los Barrancos (0 km) El Alamo (0 km) Las Angosturas (1 km) Menaute (5 km) Cerro Gavira (6 km) Los Arcos (7 km) Martin de la Jara (10 km) Llanos del Espino (12 km) El Puntal II (12 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Málaga (Andalucía) : 634.8 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 3 janvier 2024 |
||