Wind farms
Juan Adalid (Spain)| Juan Adalid (Spain) |
|
| Operational (1,6 MW) - Dismantled (1,26 MW) |

| Country | Spain |
| County/Zone | La Palma (SC Tenerife - Canarias) |
| City | Garafia (La Palma) |
| Wind farm type | Onshore wind farm |

![]() | 1.26 MW commissioned |
![]() | 1.6 MW commissioned |
![]() | 1.26 MW decommissioned |

| Developer |
![]() |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Enercon E48/800 (x 2) |
| Dismantled | Made AE-23 (x 7) |

| No source available |

| City | Garafia (La Palma) |
| Commissioning | ![]() |
| Turbines | 7x Made AE-23 (power 180 kW, diameter 23 m) |
| Total nominal power | 1,260 kW |
| Status | Dismantled |
| Developer | ![]() |
| Coordinates | Latitude 28° 50' 19.1" - Longitude -17° 54' 34.1" |
| Precise localization | Yes |
| City | Garafia (La Palma) |
| Commissioning | ![]() |
| Turbines | 2x Enercon E48/800 (power 800 kW, diameter 48 m) |
| Total nominal power | 1,600 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 28° 50' 21" - Longitude -17° 54' 33.1" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Las Tricias (9 km) Aeropuerto La Palma (29 km) Manchas Blancas (34 km) Fuencaliente (43 km) Epina (95 km) Punta Teno (111 km) Jedey (113 km) La Sabina (113 km) Tijarafe (113 km) Timijiraque (113 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) La Palma (SC Tenerife - Canarias) : 9.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 15 July 2021 |
||