Balikun Santanghu No.2 Farm (China)| Balikun Santanghu No.2 Farm (China) |
|
| Operational (448 MW) |

| Country | China |
| County/Zone | Xinjiang |
| City | Santanghu |
| Wind farm type | Onshore wind farm |

![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 48 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |
![]() | 50 MW commissioned |

| Developer | #ND |
| Operators |
![]() ![]() #ND |
| Owners |
![]() ![]() ![]() ![]() ![]() #ND |
| Manufacturer | #ND |

| Operational | #ND |

| No source available |

| City | Santanghu |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 44° 16' 32.5" - Longitude 92° 57' 15.8" |
| Precise localization | No |
| City | Santanghu |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 44° 14' 26.8" - Longitude 93° 20' 5.6" |
| Precise localization | No |
| City | Santanghu |
| Commissioning | ![]() |
| Turbine(s) | (manufacturer name not available) |
| Total nominal power | 50,000 kW |
| Status | Operational |
| Coordinates | Latitude 44° 14' 14.2" - Longitude 92° 48' 25.2" |
| Precise localization | No |
Databases ![]() China (682.8 GW) Asia (1,031.8 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Balikun Santanghu First (6 km) Santanghu (9 km) Chongqing (9 km) Hami (10 km) Balikun Santanghu (19 km) Balikun Thirteenth Division Santanghu (30 km) Hongxing 1 Pasture (33 km) Santanghu First Area B (49 km) Balikun Hongxing (60 km) Santanghu First Area D (60 km) | ||
|
Insights Production capacity China : 640,626.0 MW (end of 2025) Xinjiang : 55,272.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 September 2022 |
||