Moel Maelogen (United-Kingdom)| Moel Maelogen (United-Kingdom) |
|
| Operational (15,6 MW) |

| Country | United-Kingdom |
| County/Zone | Conwy (Wales) |
| City | Conwy |
| Wind farm type | Onshore wind farm |

![]() | 3.9 MW commissioned |
![]() | 11.7 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Siemens SWT-1.3-62 (x 12) |

| No source available |

| City | Conwy |
| Commissioning | ![]() |
| Turbines | 3x Siemens SWT-1.3-62 (power 1,300 kW, diameter 62 m) |
| Hub height | ![]() |
| Total nominal power | 3,900 kW |
| Statut | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 53° 8' 24" - Longitude -3° 43' 12" |
| Localisation précise | Oui |
| Part | Extension |
| City | Conwy |
| Commissioning | ![]() |
| Turbines | 9x Siemens SWT-1.3-62 (power 1,300 kW, diameter 62 m) |
| Hub height | ![]() |
| Total nominal power | 11,700 kW |
| Statut | Operational |
| Développeurs | /![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 53° 7' 42.7" - Longitude -3° 43' 18" |
| Localisation précise | Oui |
Bases de données ![]() United-Kingdom (104.8 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Tir Mostyn & Foel Goch (16 km) Llyn Brenig (16 km) Clocaenog Forest (17 km) Hafoty Ucha (17 km) Bodtegir (19 km) Wern Ddu (Craig Lelo) (24 km) Braich Ddu (25 km) Rhyl Flats (28 km) Caernarfon Airport (37 km) North Hoyle (37 km) | ||
|
Insights Puissance installée United-Kingdom : 32 894.0 MW (fin 2025) Conwy (Wales) : 17.1 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 29 mai 2026 |
||