Wind farms
Trimdon Grange (United-Kingdom)| Trimdon Grange (United-Kingdom) |
|
| Operational (5,2 MW) |

| Country | United-Kingdom |
| County/Zone | Durham (England) |
| City | Trimdon Grange |
| Wind farm type | Onshore wind farm |

![]() | 5.2 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Nordex N60/1300 (x 4) |

![]() | |

| Hub height | ![]() |
| Coordonnées | Latitude 54° 43' 12.4" - Longitude -1° 26' 27.3" |
| Localisation précise | Oui |
Bases de données ![]() United-Kingdom (104.8 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Hare Hill (3Hs) (5 km) Haswell Moor (6 km) Butterwick Moor (6 km) High Haswell (7 km) High Sharpley (7 km) High Volts (3Hs) (10 km) Red Gap Farm (11 km) Walkway - High Swainston (12 km) Great Eppleton (12 km) Lambs Hill (13 km) | ||
|
Insights Puissance installée United-Kingdom : 32 894.0 MW (fin 2025) Durham (England) : 154.6 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 29 mai 2026 |
||