Wind farms
TGV-TAB (Belgium)| TGV-TAB (Belgium) |
|
| Operational (28,7 MW) |

| Country | Belgium |
| County/Zone | Hainaut (Wallonie) |
| City | Antoing - Brunehaut - Tournai |
| Wind farm type | Onshore wind farm |

![]() | 16.1 MW commissioned |
![]() | 12.6 MW commissioned |

| Developer |
![]() |
| Operators |
![]() #ND |
| Owners |
![]() ![]() #ND |
| Manufacturer |
|

| Operational | Enercon E82/2300 (x 7) |
| Operational | Enercon E115/4200 (x 3) |

![]() | |
![]() | |
![]() | |

| Part | Extension |
| City | Tournai, Antoing, Brunehaut |
| Commissioning | ![]() |
| Turbines | 3x Enercon E115/4200 (power 4,200 kW, diameter 115.7 m) |
| Total nominal power | 12,600 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 50° 33' 37.4" - Longitude 3° 23' 8.7" |
| Precise localization | Yes |
| Part | Tournai |
| City | Tournai, Antoing, Brunehaut |
| Commissioning | ![]() |
| Turbines | 7x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 16,100 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 50° 34' 7.4" - Longitude 3° 24' 18.2" |
| Precise localization | Yes |
Databases ![]() Belgium (9.0 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Gaurain-Ramecroix (5 km) Tournai Gaurain (5 km) Tournai Ouest 1 et 2 (7 km) Tournai Ouest 3 (8 km) Estaimpuis (12 km) Leuze (13 km) Molenbaix (15 km) Polaris Péruwelz (15 km) Moulins Saint-Roch (16 km) Pecq (16 km) | ||
|
Insights Production capacity Belgium : 5,860.0 MW (end of 2025) Hainaut (Wallonie) : 649.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 8 April 2026 |
||