Wind farms
Vassingerød (Denmark)| Vassingerød (Denmark) |
|
| Operational (2 MW) |

| Country | Denmark |
| County/Zone | Allerod (Hovedstaden) |
| City | Vassingerød |
| Wind farm type | Onshore wind farm |

![]() | 2 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V80/2000 (x 1) |

![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 55° 49' 55.3" - Longitude 12° 18' 23.4" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Kollerod (5 km) Sosum (8 km) Herlev (8 km) Gundsomagle (15 km) Taastrup (19 km) Sonderby (Frederikssund) (20 km) Onsved (20 km) Lyngerup (20 km) Veddelev (21 km) Krogstrup (Frederikssund) (22 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Allerod (Hovedstaden) : 2.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 15 April 2017 |
||