Wind farms
Mounteneys and Cherry Rock Wind Turbines (United-Kingdom)| Mounteneys and Cherry Rock Wind Turbines (United-Kingdom) |
|
| Operational (1 MW) |

| Country | United-Kingdom |
| County/Zone | Gloucestershire (England) |
| Wind farm type | Onshore wind farm |

![]() | 0.5 MW commissioned |
![]() | 0.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | PowerWind 500 (x 2) |

![]() | |

| Part | Cherry Rock |
| City | #ND |
| Commissioning | ![]() |
| Turbine | 1x PowerWind 500 (power 500 kW, diameter 56 m) |
| Total nominal power | 500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 51° 36' 8.9" - Longitude -2° 23' 13.5" |
| Precise localization | Yes |
| Part | Mounteneys |
| City | #ND |
| Commissioning | ![]() |
| Turbine | 1x PowerWind 500 (power 500 kW, diameter 56 m) |
| Total nominal power | 500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 51° 36' 19.8" - Longitude -2° 22' 13.2" |
| Precise localization | Yes |
Databases ![]() United-Kingdom (104.8 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alveston (11 km) Lynch Knoll (13 km) Sharpness docks (15 km) Forest of Dean (17 km) Great Dunkilns Farm (22 km) Lawrence Weston (22 km) Avonmouth (23 km) Bristol Sewage Treatment Works (23 km) Accolade Wines (24 km) Bristol Port Wind Park Ltd (26 km) | ||
|
Insights Production capacity United-Kingdom : 32,894.0 MW (end of 2025) Gloucestershire (England) : 5.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 29 October 2025 |
||