Wind farms
Houyet (Belgium)| Houyet (Belgium) |
|
| Operational (2,2 MW) |

| Country | Belgium |
| County/Zone | Namur (Wallonie) |
| City | Houyet |
| Wind farm type | Onshore wind farm |

![]() | 0.6 MW commissioned |
![]() | 0.8 MW commissioned |
![]() | 0.8 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E48/800 (x 2) |
| Operational | Enercon E40/600 (x 1) |

![]() | |

| Part | Finnevaux |
| City | Houyet |
| Commissioning | ![]() |
| Turbine | 1x Enercon E40/600 (power 600 kW, diameter 40 m) |
| Total nominal power | 600 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Coordonnées | Latitude 50° 9' 36.8" - Longitude 4° 55' 44.3" |
| Localisation précise | Oui |
| Part | Finnevaux |
| City | Houyet |
| Commissioning | ![]() |
| Turbine | 1x Enercon E48/800 (power 800 kW, diameter 48 m) |
| Total nominal power | 800 kW |
| Status | Operational |
| Développeur | ![]() |
| Coordonnées | Latitude 50° 9' 36.8" - Longitude 4° 55' 44.3" |
| Localisation précise | Oui |
| Part | Mesnil-Eglise |
| City | Houyet |
| Commissioning | ![]() |
| Turbine | 1x Enercon E48/800 (power 800 kW, diameter 48 m) |
| Total nominal power | 800 kW |
| Status | Operational |
| Développeur | ![]() |
| Coordonnées | Latitude 50° 9' 22" - Longitude 4° 57' 25.3" |
| Localisation précise | Oui |
Bases de données ![]() Belgium (9 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Mesnil-St-Blaise (6 km) Falmagne (6 km) Dinant-Ciney 3 (14 km) Chevetogne (15 km) Yvoir-Dinant (16 km) Dinant-Ciney 2 (16 km) Dinant-Ciney 1 (16 km) Salazinne (16 km) Ciney-Pessoux (22 km) Bièvre (23 km) | ||
|
Insights Puissance installée Belgium : 5 860.0 MW (fin 2025) Namur (Wallonie) : 359.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 29 janvier 2021 |
||