Wind farms
Terral (ES) (Spain)| Terral (ES) (Spain) |
|
| Operational (27 MW) |

| Country | Spain |
| County/Zone | Lugo (Galicia) |
| City | Abadin |
| Wind farm type | Onshore wind farm |

![]() | 27 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Neg Micon NM44/750 (x 36) |

| No source available |

| Coordinates | Latitude 43° 21' 35.9" - Longitude -7° 28' 48" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Montemayor Sur (0 km) Montouto (0 km) Labrada (0 km) Refachón (0 km) Neda (0 km) Alto de Seixal (8 km) Fiouco (9 km) Carracedo (9 km) La Celaya (10 km) Monseivane (10 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Lugo (Galicia) : 1,839.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 January 2025 |
||