The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English Français Deutsch Español 

Online access Wind farms Baos y Pumar Fase I (Spain)


Previous page
Sign up    Log in    Search


Baos y Pumar Fase I (Spain)
Operational (30,6 MW)


Localisation  

Country Spain
County/Zone Asturias
City Cudillero - Salas - Valdes
Wind farm type Onshore wind farm

Key dates  

 30.6 MW commissioned

Players  

Developer
Operator #ND
Owner #ND
Manufacturer Gamesa

Turbines   

En fonctionnementGamesa G52/850 (x 36)

Sources  

Pas de source disponible

Informations complémentaires  

CoordonnéesLatitude 43° 30' 8.8" - Longitude -6° 15' 54.2"
Localisation préciseOui

Bases de données

     

Spain (52.7 GW)
Europe (656.6 GW)
Monde (2451.9 GW)

Tous les produits



Résumé PDF




Parcs voisins

Baos y Pumar Fase II (0 km)
Curiscao Fase II (5 km)
Curiscao Fase I (5 km)
Sierra de Bodenaya (11 km)
Pico Gallo (16 km)
Sierra de Tineo (20 km)
Peña del Cuervo (22 km)
Belmonte (22 km)
Capiechamartin (28 km)
Verdigueiro (28 km)


Insights

Puissance installée

Spain : 33 158.0 MW (fin 2025)
Asturias : 698.1 MW (*)


Légende

#ND : donnée non disponible
(*) : selon la base de données The Wind Power


Mise à jour de cette fiche

21 janvier 2025




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page