Wind farms
Belmonte (Spain)| Belmonte (Spain) |
|
| Operational (34,85 MW) |

| Country | Spain |
| County/Zone | Asturias |
| City | Belmonte de Miranda |
| Wind farm type | Onshore wind farm |

![]() | 17.85 MW commissioned |
![]() | 17 MW commissioned |

| Developer |
![]() |
| Operators |
![]() ![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G52/850 (x 21) |
| Operational | Gamesa G58/850 (x 20) |

| No source available |

| City | Belmonte de Miranda |
| Commissioning | ![]() |
| Turbines | 21x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 17,850 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 43° 18' 17.5" - Longitude -6° 16' 27.5" |
| Precise localization | Yes |
| City | Belmonte de Miranda |
| Commissioning | ![]() |
| Turbines | 20x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 17,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 43° 18' 17.5" - Longitude -6° 16' 27.5" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Sierra de Bodenaya (11 km) Sierra de Tineo (13 km) Pico Gallo (14 km) Verdigueiro (18 km) Curiscao Fase I (19 km) Curiscao Fase II (19 km) Baos y Pumar Fase II (22 km) Baos y Pumar Fase I (22 km) Peña del Cuervo (28 km) Capiechamartin (31 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Asturias : 698.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 January 2025 |
||