Wind farms
Oiz (Spain)| Oiz (Spain) |
|
| Operational (34 MW) |

| Country | Spain |
| County/Zone | Vizcaya (Euskadi) |
| City | Berriz - Mallabia |
| Wind farm type | Onshore wind farm |

![]() | 4.25 MW commissioned |
![]() | 4.25 MW commissioned |
![]() | 25.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owners |
![]() #ND |
| Manufacturer |
|

| Operational | Gamesa G58/850 (x 35) |
| Operational | Gamesa G52/850 (x 5) |

| No source available |

| City | Mallabia, Berriz |
| Commissioning | ![]() |
| Turbines | 30x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 25,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 43° 12' 56.1" - Longitude -2° 34' 40" |
| Precise localization | Yes |
| Part | Ampliación |
| City | Mallabia, Berriz |
| Commissioning | ![]() |
| Turbines | 5x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 4,250 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 43° 13' 50.1" - Longitude -2° 36' 20.4" |
| Precise localization | Yes |
| Part | Ampliación |
| City | Mallabia, Berriz |
| Commissioning | ![]() |
| Turbines | 5x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 4,250 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 43° 14' 7.1" - Longitude -2° 36' 40.4" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Elgea Ampliación (32 km) Elgea (32 km) Biscay Marine Energy Park (34 km) MPS demo - BiMEP (34 km) Elgea-Urkilla (34 km) DemoSATH (34 km) GEROA (38 km) Punta Lucero (42 km) Nautilus (ES) (44 km) Badaia (47 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Vizcaya (Euskadi) : 44.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|