Wind farms
La Bandera Ampliación (Spain)| La Bandera Ampliación (Spain) |
|
| Operational (1,3 MW) |

| Country | Spain |
| County/Zone | Navarra |
| City | Bardenas Reales - Cabanillas - Fustiñana |
| Wind farm type | Onshore wind farm |

![]() | 1.3 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Ecotecnia 62 (x 1) |

| No source available |

| Hub height | ![]() |
| Coordonnées | Latitude 42° 4' 25.5" - Longitude -1° 28' 8.6" |
| Localisation précise | Oui |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins La Bandera (0 km) Serralta Ampliación (5 km) Serralta (5 km) Cabanillas II (6 km) San Gregorio (6 km) Volandín (12 km) Pestriz (13 km) Sancho Abarca (14 km) Ablitas (14 km) Corral del Molino (16 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Navarra : 1 627.9 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 8 août 2023 |
||