Wind farms
Alcarama II (Spain)| Alcarama II (Spain) |
|
| Operational (45,05 MW) |

| Country | Spain |
| County/Zone | Logroño (La Rioja) |
| City | Cervera del Rio Alhama |
| Wind farm type | Onshore wind farm |

![]() | 28.05 MW commissioned |
![]() | 17 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G52/850 (x 33) |
| Operational | Gamesa G58/850 (x 20) |

| No source available |

| City | Cervera del Rio Alhama |
| Commissioning | ![]() |
| Turbines | 33x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 28,050 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 42° 0' 12.9" - Longitude -2° 2' 46.4" |
| Precise localization | Yes |
| City | Cervera del Rio Alhama |
| Commissioning | ![]() |
| Turbines | 20x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 17,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 42° 0' 12.9" - Longitude -2° 2' 46.4" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alcarama I (0 km) Igea (2 km) Rea Unificado (13 km) Gatún I (16 km) Gatún II (1F) (16 km) Yerga II (17 km) Luna (18 km) Yerga I (18 km) Agreda (20 km) Préjano (20 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Logroño (La Rioja) : 510.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 2 January 2024 |
||