Bordecorex Norte (Spain)| Bordecorex Norte (Spain) |
|
| Operational (44,35 MW) |

| Country | Spain |
| County/Zone | Soria (Castilla y Leon) |
| City | Bordecorex |
| Wind farm type | Onshore wind farm |

![]() | 18 MW commissioned |
![]() | 26.35 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G58/850 (x 31) |
| Operational | Gamesa G80/2000 (x 9) |

| No source available |

| City | Bordecorex |
| Commissioning | ![]() |
| Turbines | 9x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Total nominal power | 18,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 41° 22' 48" - Longitude -2° 43' 12" |
| Precise localization | No |
| City | Bordecorex |
| Commissioning | ![]() |
| Turbines | 31x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 26,350 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 41° 22' 48" - Longitude -2° 43' 12" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hontalbilla I (9 km) Los Campillos (12 km) Hontalbilla II (13 km) Dos Pueblos (21 km) Radona II (23 km) Radona I (23 km) Morón de Almazan (24 km) Tordesillas (25 km) Sierro (25 km) Ventosa del Ducado B (27 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Soria (Castilla y Leon) : 1,292.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||