Wind farms
Aguallal Ampliación (Spain)| Aguallal Ampliación (Spain) |
|
| Operational (24,95 MW) |

| Country | Spain |
| County/Zone | Zamora (Castilla y Leon) |
| City | Lubian - Pias |
| Wind farm type | Onshore wind farm |

![]() | 22.95 MW commissioned |
![]() | 2 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G58/850 (x 27) |
| Operational | Gamesa G80/2000 (x 1) |

| No source available |

| City | Lubian, Pias |
| Commissioning | ![]() |
| Turbines | 27x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 22,950 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 42° 2' 59.9" - Longitude -6° 57' 35.9" |
| Precise localization | No |
| City | Lubian, Pias |
| Turbine | 1x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 42° 2' 59.9" - Longitude -6° 57' 35.9" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Aguallal (0 km) Aerogenerador Experimental G90 (4 km) Aerogenerador I+D Gamesa (5 km) Aerogenerador Experimental G87 (Lubian) (5 km) Hedroso-Aciberos Ampliacion (5 km) Lubian Ampliación (5 km) Cinseiro (5 km) Hedroso-Aciberos (5 km) Lubian (5 km) Aciberos (5 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Zamora (Castilla y Leon) : 822.4 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 2 January 2024 |
||