Wind farms
Boquerón I (Spain)| Boquerón I (Spain) |
|
| Operational (21,78 MW) |

| Country | Spain |
| County/Zone | Zaragoza (Aragon) |
| City | Borja |
| Wind farm type | Onshore wind farm |

![]() | 21.78 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owners |
![]() ![]() |
| Manufacturer |
|

| Operational | Gamesa G47/660 (x 33) |

| No source available |

| Coordonnées | Latitude 41° 49' 47.9" - Longitude -1° 31' 48" |
| Localisation précise | Non |
Bases de données ![]() Spain (52.7 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Molino de Carragüeyes (0 km) Boquerón II (0 km) Molino de Arbolitas (0 km) Campo de Borja (0 km) Boquerón III (0 km) Borja I (0 km) Boyal II (0 km) Borja II (Arbolitas) (0 km) Boyal I (0 km) San Juan de Bargas (5 km) | ||
|
Insights Puissance installée Spain : 33 158.0 MW (fin 2025) Zaragoza (Aragon) : 4 329.6 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 3 janvier 2024 |
||