Wind farms
Gavilanes (Spain)| Gavilanes (Spain) |
|
| Operational (37,8 MW) |

| Country | Spain |
| County/Zone | Murcia |
| City | Jumilla - Yecla |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 16.5 MW commissioned |
![]() | 15.3 MW commissioned |

| Developers |
![]() #ND |
| Operator |
![]() |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Gamesa G58/850 (x 18) |
| Operational | GE Vernova 1.5sl (x 15) |

| No source available |

| City | Yecla, Jumilla |
| Commissioning | ![]() |
| Turbines | 11x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Total nominal power | 16,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 38° 36' 8" - Longitude -1° 17' 29.2" |
| Precise localization | Yes |
| Part | Ampliación |
| City | Yecla, Jumilla |
| Commissioning | ![]() |
| Turbines | 18x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 15,300 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 38° 36' 28.8" - Longitude -1° 16' 32.8" |
| Precise localization | Yes |
| Part | Ampliación |
| City | Yecla, Jumilla |
| Commissioning | ![]() |
| Turbines | 4x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 38° 36' 8" - Longitude -1° 17' 29.2" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Sierra del Buey (10 km) Reventones (13 km) Almendros II (14 km) Almendros I (14 km) La Tella (14 km) Los Pedreros (14 km) Sierra de las Cabras (16 km) La Herrada (17 km) Sierra Lacera (18 km) Cerro Revolcado (23 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Murcia : 262.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 2 January 2024 |
||