Wind farms
Chaminé (Portugal)| Chaminé (Portugal) |
|
| Operational (6,9 MW) |

| Country | Portugal |
| County/Zone | Setúbal (Alentejo/Lisboa) |
| City | Sines |
| Wind farm type | Onshore wind farm |

![]() | 2.3 MW commissioned |
![]() | 4.6 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Nordex N90/2300 (x 3) |

![]() | |
![]() | |

| City | Sines |
| Commissioning | ![]() |
| Turbines | 2x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 4,600 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 37° 51' 57.2" - Longitude -8° 45' 2.3" |
| Altitude | 100 m |
| Localisation précise | Oui |
| City | Sines |
| Commissioning | ![]() |
| Turbine | 1x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Développeur | ![]() |
| Opérateur | ![]() |
| Propriétaire | ![]() |
| Coordonnées | Latitude 37° 51' 57.2" - Longitude -8° 45' 2.3" |
| Altitude | 100 m |
| Localisation précise | Oui |
Bases de données ![]() Portugal (11.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Costa Vicentina (2 km) Moinho dos Chãos (13 km) Madrinha (63 km) Bordeira (70 km) Guerreiros (71 km) Espinhaço de Cao (72 km) Corte dos Alamos (72 km) Barao de Sao Joao (78 km) Serra do Mu (80 km) Pico Alto (81 km) | ||
|
Insights Puissance installée Portugal : 5 990.0 MW (fin 2025) Setúbal (Alentejo/Lisboa) : 31.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 26 septembre 2024 |
||