Wind farms
Meadas (Portugal)| Meadas (Portugal) |
|
| Operational (9 MW) |

| Country | Portugal |
| County/Zone | Viseu (Centro/Norte) |
| City | Lamego |
| Wind farm type | Onshore wind farm |

![]() | 9 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V90/3000 (x 3) |

![]() | |
![]() | |

| Coordinates | Latitude 41° 6' 37.1" - Longitude -7° 51' 22.8" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (656.6 GW) World (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Fonte da Mesa (3 km) Fonte da Mesa II (3 km) Vila Lobos (5 km) São Cristóvão (5 km) Bigorne (7 km) Teixeiro (9 km) Ribabelide (11 km) Lagoa D. Joao e Feirao (11 km) Seixinhos (12 km) Baiao (12 km) | ||
|
Insights Puissance installée Portugal : 5 990.0 MW (fin 2025) Viseu (Centro/Norte) : 1 161.9 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 26 septembre 2024 |
||