Wind farms
Waimes (Belgium)| Waimes (Belgium) |
|
| Operational (11,5 MW) |

| Country | Belgium |
| County/Zone | Liège (Wallonie) |
| City | Waimes |
| Other name | Hoqugné - Chivremont |
| Wind farm type | Onshore wind farm |

![]() | 11.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owners |
![]() ![]() ![]() |
| Manufacturer |
|

| Operational | Enercon E82/2300 (x 5) |

![]() | |
![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 50° 24' 16.9" - Longitude 6° 5' 49.5" |
| Precise localization | Yes |
Databases ![]() Belgium (9 GW) Europe (656.6 GW) World (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Amel (11 km) Bullange - Butgenbach (11 km) Saint-Vith (11 km) Bullange - Butgenbach II (16 km) Höfen (Nordrhein-Westfalen) (19 km) Monschau (21 km) Lambiester (21 km) Theux (21 km) Roth-West (22 km) Scheid (22 km) | ||
|
Insights Puissance installée Belgium : 5 860.0 MW (fin 2025) Liège (Wallonie) : 366.6 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 10 février 2026 |
||