Lislet 1 (France)| Lislet 1 (France) |
|
| Under construction - Dismantled (10,85 MW) |

| Country | France |
| County/Zone | 02 (Hauts-de-France) |
| City | Lislet |
| Wind farm type | Onshore wind farm |

![]() | 10 MW commissioned |
![]() | 0.85 MW commissioned |
![]() | 10 MW decommissioned |
![]() | 0.85 MW decommissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Under construction | Vestas (x 6) |
| Dismantled | Gamesa G80/2000 (x 5) |
| Dismantled | Gamesa G52/850 (x 1) |

![]() | |

| City | Lislet |
| Commissioning | ![]() |
| Turbines | 5x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Hub height | ![]() |
| Total nominal power | 10,000 kW |
| Status | Dismantled |
| Developer | ![]() |
| Coordinates | Latitude 49° 40' 19.5" - Longitude 4° 2' 0.9" |
| Precise localization | Yes |
| City | Lislet |
| Commissioning | ![]() |
| Turbine | 1x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Hub height | ![]() |
| Total nominal power | 850 kW |
| Status | Dismantled |
| Developer | ![]() |
| Coordinates | Latitude 49° 40' 19.5" - Longitude 4° 2' 0.9" |
| Precise localization | Yes |
| Part | Repowering |
| City | Lislet |
| Turbines | 6x Vestas |
| Status | Under construction |
| Coordinates | Latitude 49° 40' 19.5" - Longitude 4° 2' 0.9" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lislet 2 (0 km) Blanches Fosses (1 km) Montloué (1 km) Le Carreau Manceau (5 km) Ville aux Bois (5 km) Chaourse (5 km) Terre de Beaumont (6 km) Renneville (7 km) Epine Marie-Madeleine 2 (8 km) Montigny-la-Cour (8 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 02 (Hauts-de-France) : 1,432.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 15 November 2025 |
||