Wind farms
Stuart Municipal Utilities (USA)| Stuart Municipal Utilities (USA) |
|
| Operational (0,66 MW) |

| Country | USA |
| County/Zone | Iowa |
| City | Adair |
| Wind farm type | Onshore wind farm |

![]() | 0.66 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Vestas V47/660 (x 1) |

| No source available |

| Hub height | ![]() |
| Coordonnées | Latitude 41° 29' 37.8" - Longitude -94° 19' 38.5" |
| Localisation précise | Oui |
Bases de données ![]() USA (252.1 GW) Amériques (614.9 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Wind GEM (3 km) Arbor Hill 2018 (4 km) Arbor Hill 2019 (4 km) Wolverine (15 km) Meadow Ridge (15 km) Morning light (22 km) Sky Volt (26 km) Greenfield Wind (26 km) Forward Fontanelle (IA) (27 km) Eclipse (29 km) | ||
|
Insights Puissance installée USA : 158 826.0 MW (fin 2025) Iowa : 15 858.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 21 décembre 2025 |
||