Wind farms
Intrepid (USA)| Intrepid (USA) |
|
| Operational (160,5 MW) - Dismantled (160,5 MW) |

| Country | USA |
| County/Zone | Iowa |
| City | Buena Vista - Sac |
| Wind farm type | Onshore wind farm |

![]() | 160.5 MW commissioned |
![]() | 160.5 MW decommissioned |
![]() | 160.5 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturer |
|

| Operational | GE Vernova 1.5xle (x 107) |
| Dismantled | GE Vernova 1.5s (x 107) |

![]() | |

| City | Buena Vista, Sac |
| Commissioning | ![]() |
| Turbines | 107x GE Vernova 1.5s (power 1,500 kW, diameter 70.5 m) |
| Hub height | ![]() |
| Total nominal power | 160,500 kW |
| Status | Dismantled (2017) |
| Développeur | ![]() |
| Coordonnées | Latitude 42° 29' 7.9" - Longitude -95° 19' 14.6" |
| Localisation précise | Oui |
| Part | Repowering |
| City | Buena Vista, Sac |
| Commissioning | ![]() |
| Turbines | 107x GE Vernova 1.5xle (power 1,500 kW, diameter 82.5 m) |
| Hub height | ![]() |
| Total nominal power | 160,500 kW |
| Status | Operational |
| Opérateur | ND |
| Propriétaire | ND |
| Coordonnées | Latitude 42° 29' 7.9" - Longitude -95° 19' 14.6" |
| Localisation précise | Oui |
Bases de données ![]() USA (252.1 GW) Amériques (614.9 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Intrepid Expansion (7 km) Ida Grove II (13 km) Sac County wind farm (15 km) Ida Grove (21 km) Richland (24 km) Northwest Wind Wind Farm (25 km) Storm Lake II (27 km) Storm Lake I (27 km) Wall Lake Municipal Utilities (29 km) New Harvest (40 km) | ||
|
Insights Puissance installée USA : 158 826.0 MW (fin 2025) Iowa : 15 858.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 21 décembre 2025 |
||