Wind farms
Flying Cloud (USA)| Flying Cloud (USA) |
|
| Operational (43,5 MW) |

| Country | USA |
| County/Zone | Iowa |
| City | Dickenson |
| Wind farm type | Onshore wind farm |

![]() | 43.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.5sl (x 29) |

| No source available |

| Hub height | ![]() |
| Coordonnées | Latitude 43° 21' 50.2" - Longitude -95° 17' 15.1" |
| Localisation précise | Oui |
Bases de données ![]() USA (252.1 GW) Amériques (614.9 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Lost Lakes Wind Farm (4 km) Endeavor I (12 km) Endeavor II (12 km) Spirit Lake (16 km) Spirit Lake II (16 km) Upland Prairie (19 km) Clay Central-Everly School District (25 km) South Fork Wind Farm (28 km) Allendorf (29 km) Sibley Wind Farm (30 km) | ||
|
Insights Puissance installée USA : 158 826.0 MW (fin 2025) Iowa : 15 858.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 21 décembre 2025 |
||