Wind farms
Hancock County Wind Farm (USA)| Hancock County Wind Farm (USA) |
|
| Operational (97,68 MW) - Dismantled (97,68 MW) |

| Country | USA |
| County/Zone | Iowa |
| City | Hancock |
| Wind farm type | Onshore wind farm |

![]() | 97.68 MW commissioned |
![]() | 97.68 MW decommissioned |
![]() | 97.68 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Gamesa G47/660 (x 148) |
| Dismantled | Vestas V47/660 (x 148) |

![]() | |

| City | Hancock |
| Commissioning | ![]() |
| Turbines | 148x Vestas V47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 97,680 kW |
| Status | Dismantled (2019) |
| Developer | ![]() |
| Coordinates | Latitude 42° 57' 8" - Longitude -93° 39' 7.3" |
| Precise localization | Yes |
| Part | Repowering |
| City | Hancock |
| Commissioning | ![]() |
| Turbines | 148x Gamesa G47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 97,680 kW |
| Status | Operational |
| Coordinates | Latitude 42° 57' 8" - Longitude -93° 39' 7.3" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Cerro Gordo Repower (19 km) Cerro Gordo (19 km) Whispering Willow North (28 km) Kossuth (32 km) Crystal Lake (33 km) Crystal Lake - GE Energy (34 km) Forest City High School (35 km) CR Holland Crane Service (36 km) Mason City (38 km) Crystal Lake - Clipper (38 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Iowa : 15,858.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 30 December 2025 |
||