Wind farms
Woodward Mountain II (USA)| Woodward Mountain II (USA) |
|
| Operational (76,56 MW) - Dismantled (76,56 MW) |

| Country | USA |
| County/Zone | Texas |
| City | Pecos |
| Wind farm type | Onshore wind farm |

![]() | 73.92 MW commissioned |
![]() | 2.64 MW commissioned |
![]() | 2.64 MW decommissioned |
![]() | 73.92 MW decommissioned |
![]() | 76.56 MW commissioned |

| Developers |
![]() ![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
#ND |

| Operational | #ND (x 116) |
| Dismantled | Gamesa G47/660 (x 112) |
| Dismantled | Vestas V47/660 (x 4) |

![]() | |
![]() | |
![]() | |

| City | Pecos |
| Commissioning | ![]() |
| Turbines | 4x Vestas V47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 2,640 kW |
| Status | Dismantled (2018) |
| Developers | /![]() |
| Coordinates | Latitude 30° 57' 16.2" - Longitude -102° 25' 22.1" |
| Precise localization | Yes |
| City | Pecos |
| Commissioning | ![]() |
| Turbines | 112x Gamesa G47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 73,920 kW |
| Status | Dismantled (2018) |
| Developers | /![]() |
| Coordinates | Latitude 30° 57' 16.2" - Longitude -102° 25' 22.1" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Woodward Mountain I (0 km) Sherbino II (20 km) Sherbino I (20 km) Desert Sky Wind Farm (26 km) Indian Mesa Wind Farm (27 km) Desert Sky Wind Farm Repowering (31 km) Southwest Mesa Wind Farm (32 km) King Mountain Wind Ranch (36 km) Ranchero (55 km) High Lonesome (TX) (55 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Texas : 50,699.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 30 December 2025 |
||