Ransonmoor Farm (United-Kingdom)| Ransonmoor Farm (United-Kingdom) |
|
| Operational (10 MW) |

| Country | United-Kingdom |
| County/Zone | Cambridgeshire (England) |
| City | Doddington |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 4 MW commissioned |

| Developers |
![]() ![]() |
| Operator | #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Gamesa G80/2000 (x 3) |
| Operational | Repower MM82 (x 2) |

![]() | |

| Part | Phase 1 |
| City | Doddington |
| Commissioning | ![]() |
| Turbines | 3x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Développeurs | /![]() |
| Propriétaires | /#ND |
| Coordonnées | Latitude 52° 30' 36.9" - Longitude 0° 2' 2.5" |
| Localisation précise | Oui |
| Part | Phase 2 |
| City | Doddington |
| Commissioning | ![]() |
| Turbines | 2x Repower MM82 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Développeurs | /![]() |
| Propriétaires | /#ND |
| Coordonnées | Latitude 52° 30' 44.7" - Longitude 0° 2' 28.2" |
| Localisation précise | Oui |
Bases de données ![]() United-Kingdom (104.8 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Boarding House (1 km) Lower Botany Bay (3 km) Burnthouse Farm (5 km) Greenvale (5 km) Long Hill Road (7 km) March Sewage Works (7 km) Glass Moor (10 km) Glass Moor II (10 km) Red Tile (10 km) Stags Holt (10 km) | ||
|
Insights Puissance installée United-Kingdom : 32 894.0 MW (fin 2025) Cambridgeshire (England) : 231.4 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|