Carretera Arinaga (Spain)
Operational (8,25 MW) - Dismantled (3,96 MW)


Localisation  

Country Spain
County/Zone Gran Canaria (Las Palmas - Canarias)
City Agüimes
Wind farm type Onshore wind farm

Key dates  

 0.33 MW commissioned
 1.32 MW commissioned
 2.64 MW commissioned
 0.66 MW commissioned
 0.66 MW commissioned
 0.66 MW decommissioned
 2 MW commissioned
 0.66 MW decommissioned
 2.64 MW decommissioned
 4.5 MW commissioned
 0.1 MW commissioned

Players  

Developers
#ND
Operator #ND
Owners
#ND
Manufacturers ACSA
Enercon
Made

Turbines   

OperationalEnercon E44/900 (x 5)
OperationalMade AE-46/I (x 2)
OperationalEnercon E70/2000 (x 1)
OperationalMade AE-32 (x 1)
OperationalACSA A20/100 (x 1)
DismantledMade AE-46/I (x 5)
DismantledMade AE-32 (x 2)

Sources  

No source available

Details  

Part #1



CityAgüimes
Commissioning
Turbine1x Enercon E70/2000 (power 2,000 kW, diameter 70 m)
Total nominal power2,000 kW
StatusOperational
Developer
CoordinatesLatitude 27° 51' 30.6" - Longitude -15° 24' 19.1"
Precise localizationYes

Part #2



CityAgüimes
Commissioning
Turbine1x Made AE-32 (power 330 kW, diameter 32 m)
Total nominal power330 kW
StatusOperational
Developer
Owner
CoordinatesLatitude 27° 51' 52.5" - Longitude -15° 24' 31.8"
Precise localizationNo

Part #3



CityAgüimes
Commissioning
Turbines2x Made AE-46/I (power 660 kW, diameter 46 m)
Total nominal power1,320 kW
StatusOperational
Developer
Owner
CoordinatesLatitude 27° 51' 58.3" - Longitude -15° 26' 44.3"
Precise localizationYes

Part #4



CityAgüimes
Turbine1x ACSA A20/100 (power 100 kW, diameter 20 m)
Total nominal power100 kW
StatusOperational
CoordinatesLatitude 27° 51' 44.7" - Longitude -15° 24' 30.3"
Precise localizationYes

Part #5



CityAgüimes
Commissioning
Turbines4x Made AE-46/I (power 660 kW, diameter 46 m)
Total nominal power2,640 kW
StatusDismantled (2023)
Developer
CoordinatesLatitude 27° 51' 58.3" - Longitude -15° 26' 44.3"
Precise localizationYes

Part #6



CityAgüimes
Commissioning
Turbine1x Made AE-46/I (power 660 kW, diameter 46 m)
Total nominal power660 kW
StatusDismantled (2017)
Developer
CoordinatesLatitude 27° 51' 52.5" - Longitude -15° 24' 31.8"
Precise localizationNo

Part #7



CityAgüimes
Commissioning
Turbines2x Made AE-32 (power 330 kW, diameter 32 m)
Total nominal power660 kW
StatusDismantled (2012)
CoordinatesLatitude 27° 51' 52.5" - Longitude -15° 24' 31.8"
Precise localizationNo

Part #8



CityAgüimes
Commissioning
Turbines5x Enercon E44/900 (power 900 kW, diameter 44 m)
Total nominal power4,500 kW
StatusOperational
CoordinatesLatitude 27° 51' 52.5" - Longitude -15° 24' 31.8"
Precise localizationNo

Databases

     

Spain (52.7 GW)
Europe (656.6 GW)
World (2,451.9 GW)

All databases



PDF Summary




Nearby wind farms

Balcon de Balos (0 km)
Montaña San Francisco I (1 km)
Arinaga Depuradora (1 km)
Ingenio (Arinaga GC-1) (1 km)
Los Cactus (1 km)
Gamesa 5MW Test Turbine (2 km)
Finca de San Antonio (2 km)
Bahia de Formas II (3 km)
Bahia de Formas III (3 km)
Bahia de Formas IV (3 km)


Insights

Production capacity

Spain : 33,158.0 MW (end of 2025)
Gran Canaria (Las Palmas - Canarias) : 239.5 MW (*)


Légende

#ND : no data
(*) : according to The Wind Power database


Update for this sheet

23 September 2025




The Wind Power
All rights reserved - 2005-2026 - Cookie Policy
Conditions of Use and Sale
The Wind Power LinkedIn page   The Wind Power Twitter page