Pico da Urze (Portugal)| Pico da Urze (Portugal) |
|
| Operational (1,8 MW) - Dismantled (0,55 MW) |

| Country | Portugal |
| County/Zone | Acores |
| City | Sao Jorge |
| Wind farm type | Onshore wind farm |

![]() | 0.4 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.6 MW commissioned |
![]() | 1.2 MW commissioned |
![]() | 0.4 MW decommissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Enercon E30/300 (x 6) |
| Dismantled | Nordtank (x 5) |

![]() | |

| Part | Pico da Urze Ib |
| City | Sao Jorge |
| Commissioning | ![]() |
| Turbines | 4x Nordtank |
| Total nominal power | 400 kW |
| Status | Dismantled |
| Coordinates | Latitude 38° 36' 33.9" - Longitude -27° 56' 38.2" |
| Precise localization | No |
| Part | Pico da Urze Ib |
| City | Sao Jorge |
| Commissioning | ![]() |
| Turbine | 1x Nordtank |
| Total nominal power | 150 kW |
| Status | Dismantled |
| Coordinates | Latitude 38° 36' 33.9" - Longitude -27° 56' 38.2" |
| Precise localization | No |
| Part | Pico da Urze II |
| City | Sao Jorge |
| Commissioning | ![]() |
| Turbines | 2x Enercon E30/300 (power 300 kW, diameter 30 m) |
| Total nominal power | 600 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 38° 36' 33.9" - Longitude -27° 56' 38.2" |
| Precise localization | No |
| Part | Pico da Urze III |
| City | Sao Jorge |
| Commissioning | ![]() |
| Turbines | 4x Enercon E30/300 (power 300 kW, diameter 30 m) |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 38° 36' 33.9" - Longitude -27° 56' 38.2" |
| Precise localization | No |
Databases ![]() Portugal (11.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Terras do Canto (32 km) Serra Branca (48 km) Graciosa (48 km) Serra Branca II (48 km) Salao (63 km) Lomba dos Frades (68 km) Serra do Cume (73 km) Serra do Cume Norte (73 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Acores : 39.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|