Wind farms
Vridsted (Denmark)| Vridsted (Denmark) |
|
| Operational (3,07 MW) |

| Country | Denmark |
| County/Zone | Viborg (Midtjylland) |
| City | Vridsted |
| Wind farm type | Onshore wind farm |

![]() | 0.5 MW commissioned |
![]() | 0.5 MW commissioned |
![]() | 1.32 MW commissioned |
![]() | 0.75 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V47/660 (x 2) |
| Operational | Vestas V39/500 (x 1) |
| Operational | Vestas (x 1) |
| Operational | Neg Micon NM48/750 (x 1) |

![]() | |

| City | Vridsted |
| Commissioning | ![]() |
| Turbine | 1x Vestas V39/500 (power 500 kW, diameter 39 m) |
| Hub height | ![]() |
| Total nominal power | 500 kW |
| Status | Operational |
| Coordinates | Latitude 56° 25' 27.3" - Longitude 9° 1' 14.9" |
| Precise localization | Yes |
| City | Vridsted |
| Commissioning | ![]() |
| Turbine | 1x Vestas |
| Hub height | ![]() |
| Total nominal power | 500 kW |
| Status | Operational |
| Coordinates | Latitude 56° 25' 27.3" - Longitude 9° 1' 14.9" |
| Precise localization | Yes |
| City | Vridsted |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 56° 25' 27.3" - Longitude 9° 1' 14.9" |
| Precise localization | Yes |
| City | Vridsted |
| Commissioning | ![]() |
| Turbines | 2x Vestas V47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 1,320 kW |
| Status | Operational |
| Coordinates | Latitude 56° 25' 27.3" - Longitude 9° 1' 14.9" |
| Precise localization | Yes |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Vroue (2 km) Sjorup (Viborg) (4 km) Daugbjerg (7 km) Rorgard (8 km) Fly (8 km) Smollerup (9 km) Feldingbjerg (11 km) Gammelstrup (12 km) Sevel (12 km) Svenstrup (12 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Viborg (Midtjylland) : 68.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 12 June 2018 |
||