Wind farms
Nova Ves v Horach II (Czech Republic)| Nova Ves v Horach II (Czech Republic) |
|
| Operational (9,7 MW) |

| Country | Czech Republic |
| County/Zone | Ustecky |
| Wind farm type | Onshore wind farm |

![]() | 1.5 MW commissioned |
![]() | 8.2 MW commissioned |

| Developer | #ND |
| Operators |
![]() ![]() |
| Owner | #ND |
| Manufacturers |
|

| Operational | Senvion MM92/2050 (x 4) |
| Operational | Repower MD70 (x 1) |

| No source available |

| City | #ND |
| Commissioning | ![]() |
| Turbines | 4x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Hub height | ![]() |
| Total nominal power | 8,200 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 50° 35' 51.4" - Longitude 13° 29' 35.3" |
| Precise localization | Yes |
| City | #ND |
| Commissioning | ![]() |
| Turbine | 1x Repower MD70 (power 1,500 kW, diameter 70 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 50° 35' 51.4" - Longitude 13° 29' 35.3" |
| Precise localization | Yes |
Databases ![]() Czech Republic (0.4 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Nova Ves v Horach I (0 km) Kliny (6 km) Heidersdorf (12 km) Ditt (12 km) Sayda (13 km) Rübenau (13 km) Dittmannsdorf (14 km) Hallbach (16 km) Ansprung (17 km) Clausnitz (17 km) | ||
|
Insights Production capacity Czech Republic : 372.0 MW (end of 2025) Ustecky : 87.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 December 2020 |
||