Wind farms
Kollerod (Denmark)| Kollerod (Denmark) |
|
| Operational (0,725 MW) - Dismantled (0,15 MW) |

| Country | Denmark |
| County/Zone | Allerod (Hovedstaden) |
| City | Kollerod |
| Wind farm type | Onshore wind farm |

![]() | 0.15 MW commissioned |
![]() | 0.225 MW commissioned |
![]() | 0.5 MW commissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Vestas V39/500 (x 1) |
| Operational | Vestas V27/225 (x 1) |
| Dismantled | Wind World (x 1) |

![]() | |

| City | Kollerod |
| Commissioning | ![]() |
| Turbine | 1x Vestas V39/500 (power 500 kW, diameter 39 m) |
| Hub height | ![]() |
| Total nominal power | 500 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 55° 52' 22.7" - Longitude 12° 18' 3.5" |
| Precise localization | No |
| City | Kollerod |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Total nominal power | 225 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 55° 52' 22.7" - Longitude 12° 18' 3.5" |
| Precise localization | No |
| City | Kollerod |
| Commissioning | ![]() |
| Turbine | 1x Wind World |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2005/09) |
| Coordinates | Latitude 55° 52' 22.7" - Longitude 12° 18' 3.5" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Herlev (4 km) Vassingerød (5 km) Sosum (12 km) Gundsomagle (18 km) Lyngerup (21 km) Onsved (21 km) Sonderby (Frederikssund) (23 km) Monge (23 km) Krogstrup (Frederikssund) (23 km) Taastrup (24 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Allerod (Hovedstaden) : 2.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||