Wind farms
Tjorneby-Utterslev (Denmark)| Tjorneby-Utterslev (Denmark) |
|
| Operational (15 MW) |

| Country | Denmark |
| County/Zone | Lolland (Sjaelland) |
| City | Tjorneby |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 6 MW commissioned |
![]() | 3 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Siemens SWT-3.0-113 (x 5) |

![]() | |

| City | Tjorneby |
| Commissioning | ![]() |
| Turbines | 2x Siemens SWT-3.0-113 (power 3,000 kW, diameter 113 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Coordonnées | Latitude 54° 56' 9.5" - Longitude 11° 10' 22.1" |
| Localisation précise | Oui |
| City | Tjorneby |
| Commissioning | ![]() |
| Turbines | 2x Siemens SWT-3.0-113 (power 3,000 kW, diameter 113 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Coordonnées | Latitude 54° 56' 9.5" - Longitude 11° 10' 22.1" |
| Localisation précise | Oui |
| City | Tjorneby |
| Commissioning | ![]() |
| Turbine | 1x Siemens SWT-3.0-113 (power 3,000 kW, diameter 113 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Coordonnées | Latitude 54° 56' 9.5" - Longitude 11° 10' 22.1" |
| Localisation précise | Oui |
Bases de données ![]() Denmark (10.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Tjorneby (2 km) Vindeby (2 km) Utterslev (2 km) Kastager (2 km) Horslunde (4 km) Rolokke (4 km) Vindeby-Lolland (5 km) Kobelev (5 km) Vesterbo (5 km) Svingbjerg (5 km) | ||
|
Insights Puissance installée Denmark : 7 508.0 MW (fin 2025) Lolland (Sjaelland) : 300.4 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 14 juin 2018 |
||