Uhre (Denmark)| Uhre (Denmark) |
|
| Operational (4,05 MW) - Dismantled (0,15 MW) |

| Country | Denmark |
| County/Zone | Ikast-Brande (Midtjylland) |
| City | Uhre |
| Wind farm type | Onshore wind farm |

![]() | 0.15 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 3.9 MW commissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Bonus B62/1300 (x 3) |
| Operational | Nordex N27/150 (x 1) |
| Dismantled | Wind World W2500/25 (x 1) |

![]() | |

| City | Uhre |
| Commissioning | ![]() |
| Turbines | 3x Bonus B62/1300 (power 1,300 kW, diameter 62 m) |
| Hub height | ![]() |
| Total nominal power | 3,900 kW |
| Status | Operational |
| Coordinates | Latitude 55° 55' 27.3" - Longitude 9° 3' 55.3" |
| Precise localization | Yes |
| City | Uhre |
| Commissioning | ![]() |
| Turbine | 1x Nordex N27/150 (power 150 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Operational |
| Coordinates | Latitude 55° 55' 53.5" - Longitude 9° 3' 3" |
| Precise localization | No |
| City | Uhre |
| Commissioning | ![]() |
| Turbine | 1x Wind World W2500/25 (power 150 kW, diameter 25 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2010/06) |
| Coordinates | Latitude 55° 55' 53.5" - Longitude 9° 3' 3" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Skærlund (3 km) Brande (5 km) Langkær (7 km) Hesselbjerge (9 km) Svindbæk (10 km) Svindbæk (Ikast-Brande) (10 km) Omvra (11 km) Hindskov (12 km) Lona (12 km) Kokborg (12 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Ikast-Brande (Midtjylland) : 82.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 19 December 2019 |
||