Wind farms
Jordlose (Denmark)| Jordlose (Denmark) |
|
| Operational (0,75 MW) - Dismantled (0,15 MW) |

| Country | Denmark |
| County/Zone | Assens (Syddanmark) |
| City | Jordlose |
| Wind farm type | Onshore wind farm |

![]() | 0.15 MW commissioned |
![]() | 0.75 MW commissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Neg Micon NM48/750 (x 1) |
| Dismantled | Neg Micon (x 1) |

![]() | |

| City | Jordlose |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 55° 12' 0.7" - Longitude 10° 9' 21.8" |
| Precise localization | No |
| City | Jordlose |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2002/10) |
| Coordinates | Latitude 55° 12' 0.7" - Longitude 10° 9' 21.8" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Haarby (3 km) Voldtofte (7 km) Kong (7 km) Flemlose (8 km) Langsted (9 km) Lyndelse (9 km) Dærup (10 km) Olsted (10 km) Horne (Faaborg-Midtfyn) (10 km) Verninge (11 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Assens (Syddanmark) : 32.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||