Wind farms
Kettinge (Denmark)| Kettinge (Denmark) |
|
| Operational (3 MW) |

| Country | Denmark |
| County/Zone | Guldborgsund (Sjaelland) |
| City | Kettinge |
| Wind farm type | Onshore wind farm |

![]() | 0.75 MW commissioned |
![]() | 2.25 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Neg Micon NM48/750 (x 4) |

![]() | |

| City | Kettinge |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 54° 42' 18.1" - Longitude 11° 43' 43.7" |
| Precise localization | No |
| City | Kettinge |
| Commissioning | ![]() |
| Turbines | 3x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 2,250 kW |
| Status | Operational |
| Coordinates | Latitude 54° 42' 18.1" - Longitude 11° 43' 43.7" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Frejlev - Kettinge (0 km) Lagerup-Bregninge (2 km) Bregninge (Guldborgsund) (2 km) Gronnegade (3 km) Frejlev (3 km) Nysted (4 km) Musse (5 km) Flintinge (6 km) Oster Ulslev (7 km) Vantore (7 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Guldborgsund (Sjaelland) : 61.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||