Wind farms
Langkastrup (Denmark)| Langkastrup (Denmark) |
|
| Operational (1,5 MW) |

| Country | Denmark |
| County/Zone | Randers (Midtjylland) |
| City | Langkastrup |
| Wind farm type | Onshore wind farm |

![]() | 0.75 MW commissioned |
![]() | 0.75 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Neg Micon NM48/750 (x 2) |

![]() | |

| City | Langkastrup |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 56° 27' 5.4" - Longitude 10° 13' 12.3" |
| Precise localization | No |
| City | Langkastrup |
| Commissioning | ![]() |
| Turbine | 1x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordinates | Latitude 56° 27' 5.4" - Longitude 10° 13' 12.3" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Virring (Randers) (2 km) Tammestrup (2 km) Hollandsbjerg (4 km) Assentoft (5 km) Hollanadsbjerg - Orsted (6 km) Orsted (Norddjurs) (6 km) Vestrup (7 km) Lime (7 km) Harridslev (8 km) Lindbjerg (9 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Randers (Midtjylland) : 294.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||