Wind farms
Orsted (Norddjurs) (Denmark)| Orsted (Norddjurs) (Denmark) |
|
| Operational (3,75 MW) - Dismantled (4,2 MW) |

| Country | Denmark |
| County/Zone | Norddjurs (Midtjylland) |
| City | Orsted |
| Wind farm type | Onshore wind farm |

![]() | 3.9 MW commissioned |
![]() | 0.3 MW commissioned |
![]() | 2.25 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 3.9 MW decommissioned |
![]() | 0.3 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Neg Micon NM48/750 (x 5) |
| Dismantled | Nordtank NTK130/22 (x 30) |
| Dismantled | Nordtank NTK300/31 (x 1) |

![]() | |

| City | Orsted |
| Commissioning | ![]() |
| Turbines | 3x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 2,250 kW |
| Status | Operational |
| Coordonnées | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Localisation précise | Non |
| City | Orsted |
| Commissioning | ![]() |
| Turbines | 2x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Coordonnées | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Localisation précise | Non |
| City | Orsted |
| Commissioning | ![]() |
| Turbines | 30x Nordtank NTK130/22 (power 130 kW, diameter 21.5 m) |
| Hub height | ![]() |
| Total nominal power | 3,900 kW |
| Status | Dismantled (2002/10) |
| Coordonnées | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Localisation précise | Non |
| City | Orsted |
| Commissioning | ![]() |
| Turbine | 1x Nordtank NTK300/31 (power 300 kW, diameter 31 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Dismantled (2002/10) |
| Coordonnées | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Localisation précise | Non |
Bases de données ![]() Denmark (10.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Hollanadsbjerg - Orsted (0 km) Hollandsbjerg (2 km) Torslev (Norddjurs) (6 km) Langkastrup (6 km) Virring (Randers) (6 km) Hevring (7 km) Tammestrup (8 km) Lindbjerg (9 km) Harridslev (9 km) Vestrup (9 km) | ||
|
Insights Puissance installée Denmark : 7 508.0 MW (fin 2025) Norddjurs (Midtjylland) : 57.0 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 26 avril 2019 |
||