Wind farms
Kumled (Denmark)| Kumled (Denmark) |
|
| Operational (1,41 MW) |

| Country | Denmark |
| County/Zone | Tonder (Syddanmark) |
| City | Kumled |
| Wind farm type | Onshore wind farm |

![]() | 0.75 MW commissioned |
![]() | 0.66 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Micon M1500-750 (x 1) |
| Operational | Vestas V47/660 (x 1) |

![]() | |

| City | Kumled |
| Commissioning | ![]() |
| Turbine | 1x Micon M1500-750 (power 750 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 750 kW |
| Status | Operational |
| Coordonnées | Latitude 55° 3' 52.6" - Longitude 8° 51' 22.7" |
| Localisation précise | Non |
| City | Kumled |
| Commissioning | ![]() |
| Turbine | 1x Vestas V47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 660 kW |
| Status | Operational |
| Coordonnées | Latitude 55° 3' 52.6" - Longitude 8° 51' 22.7" |
| Localisation précise | Non |
Bases de données ![]() Denmark (10.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Bredebro (2 km) Brede (3 km) Ellum (4 km) Drengsted (4 km) Borg (4 km) Vester Terp (5 km) Logumgarde (5 km) Harres (5 km) Solsted (6 km) Logumkloster (6 km) | ||
|
Insights Puissance installée Denmark : 7 508.0 MW (fin 2025) Tonder (Syddanmark) : 185.8 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 21 septembre 2017 |
||