Wind farms
Bovlund (Denmark)| Bovlund (Denmark) |
|
| Operational (1,65 MW) |

| Country | Denmark |
| County/Zone | Tonder (Syddanmark) |
| City | Bovlund |
| Wind farm type | Onshore wind farm |

![]() | 0.25 MW commissioned |
![]() | 0.25 MW commissioned |
![]() | 0.3 MW commissioned |
![]() | 0.25 MW commissioned |
![]() | 0.6 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
#ND |

| Operational | #ND (x 4) |
| Operational | Nordex N43/600 (x 1) |
| Operational | Nordex N27/250 (x 1) |

![]() | |

| City | Bovlund |
| Commissioning | ![]() |
| Turbine | 1x Nordex N43/600 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 5.4" - Longitude 9° 5' 8.4" |
| Precise localization | No |
| City | Bovlund |
| Commissioning | ![]() |
| Turbine | 1x Nordex N27/250 (power 250 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 250 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 5.4" - Longitude 9° 5' 8.4" |
| Precise localization | No |
| City | Bovlund |
| Commissioning | ![]() |
| Turbines | 2x (manufacturer name not available) |
| Total nominal power | 300 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 5.4" - Longitude 9° 5' 8.4" |
| Precise localization | No |
| City | Bovlund |
| Commissioning | ![]() |
| Turbine | 1x (manufacturer name not available) |
| Total nominal power | 250 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 5.4" - Longitude 9° 5' 8.4" |
| Precise localization | No |
| City | Bovlund |
| Commissioning | ![]() |
| Turbine | 1x (manufacturer name not available) |
| Total nominal power | 250 kW |
| Status | Operational |
| Coordinates | Latitude 55° 6' 5.4" - Longitude 9° 5' 8.4" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Branderup (3 km) Oster Terp (3 km) Agerskov (4 km) Roost (6 km) Klovtoft (7 km) Mellerup (7 km) Landeby (8 km) Hellevad (Aabenraa) (8 km) Norre Logum (8 km) Nr. Logum (8 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Tonder (Syddanmark) : 185.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||