Wind farms
Gudum (Slagelse) (Denmark)| Gudum (Slagelse) (Denmark) |
|
| Operational (3 MW) |

| Country | Denmark |
| County/Zone | Slagelse (Sjaelland) |
| City | Gudum |
| Wind farm type | Onshore wind farm |

![]() | 1.8 MW commissioned |
![]() | 1.2 MW commissioned |

| Developer | #ND |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Bonus B44/600 (x 3) |
| Operational | Micon M1800-600/48 (x 2) |

![]() | |

| City | Gudum |
| Commissioning | ![]() |
| Turbines | 3x Bonus B44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 1,800 kW |
| Status | Operational |
| Opérateur | ND |
| Coordonnées | Latitude 55° 25' 51.3" - Longitude 11° 22' 57" |
| Localisation précise | Non |
| City | Gudum |
| Commissioning | ![]() |
| Turbines | 2x Micon M1800-600/48 (power 600 kW, diameter 48 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Coordonnées | Latitude 55° 25' 51.3" - Longitude 11° 22' 57" |
| Localisation précise | Non |
Bases de données ![]() Denmark (10.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Arslev (3 km) Sonderup (4 km) Arslev By-Sonderup (4 km) Sorterup (4 km) Tyvelse (4 km) Havrebjerg (5 km) Orslev (Kalundborg) (5 km) Hyllerup (5 km) Nordrup (6 km) Solbjerg (Kalundborg) (6 km) | ||
|
Insights Puissance installée Denmark : 7 508.0 MW (fin 2025) Slagelse (Sjaelland) : 38.7 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 26 avril 2019 |
||