Wind farms
Krummerup (Denmark)| Krummerup (Denmark) |
|
| Operational (9,2 MW) - Dismantled (1,8 MW) |

| Country | Denmark |
| County/Zone | Naestved (Sjaelland) |
| City | Krummerup |
| Wind farm type | Onshore wind farm |

![]() | 1.8 MW commissioned |
![]() | 1.8 MW decommissioned |
![]() | 9.2 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Siemens SWT-2.3-93 (x 4) |
| Dismantled | Micon M1500-600 (x 3) |

![]() | |

| City | Krummerup |
| Commissioning | ![]() |
| Turbines | 3x Micon M1500-600 (power 600 kW, diameter 43 m) |
| Hub height | ![]() |
| Total nominal power | 1,800 kW |
| Status | Dismantled (2009/10) |
| Coordonnées | Latitude 55° 17' 57.5" - Longitude 11° 30' 42.2" |
| Localisation précise | Non |
| City | Krummerup |
| Commissioning | ![]() |
| Turbines | 4x Siemens SWT-2.3-93 (power 2,300 kW, diameter 93 m) |
| Hub height | ![]() |
| Total nominal power | 9,200 kW |
| Status | Operational |
| Coordonnées | Latitude 55° 17' 57.5" - Longitude 11° 30' 42.2" |
| Localisation précise | Non |
Bases de données ![]() Denmark (10.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Flemstofte (2 km) Bendslev (2 km) Fuglebjerg (2 km) Haldagerlille (3 km) Sneslev - Forslev (4 km) Arlose (4 km) Harslev (4 km) Forslev (Naestved) (5 km) Hyllested (5 km) Vemmelose (5 km) | ||
|
Insights Puissance installée Denmark : 7 508.0 MW (fin 2025) Naestved (Sjaelland) : 74.9 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 21 septembre 2017 |
||