Wind farms
Heltborg (Denmark)| Heltborg (Denmark) |
|
| Dismantled (0,925 MW) |

| Country | Denmark |
| County/Zone | Thisted (Nordjylland) |
| City | Heltborg |
| Wind farm type | Onshore wind farm |

![]() | 0.225 MW commissioned |
![]() | 0.225 MW commissioned |
![]() | 0.25 MW commissioned |
![]() | 0.225 MW commissioned |
![]() | 0.25 MW decommissioned |
![]() | 0.225 MW decommissioned |
![]() | 0.225 MW decommissioned |
![]() | 0.225 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Dismantled | Vestas V27/225 (x 3) |
| Dismantled | Micon M530 (x 1) |

![]() | |

| City | Heltborg |
| Commissioning | ![]() |
| Turbine | 1x Micon M530 (power 250 kW, diameter 26 m) |
| Hub height | ![]() |
| Total nominal power | 250 kW |
| Status | Dismantled (2015/10) |
| Coordinates | Latitude 56° 45' 12.5" - Longitude 8° 27' 17.7" |
| Precise localization | No |
| City | Heltborg |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Dismantled (2017/06) |
| Coordinates | Latitude 56° 45' 12.5" - Longitude 8° 27' 17.7" |
| Precise localization | No |
| City | Heltborg |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Dismantled (2017/01) |
| Coordinates | Latitude 56° 45' 12.5" - Longitude 8° 27' 17.7" |
| Precise localization | No |
| City | Heltborg |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Dismantled (2016/04) |
| Coordinates | Latitude 56° 45' 12.5" - Longitude 8° 27' 17.7" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Ullerup (Thisted) (2 km) Grurup (2 km) Hurup (2 km) Ettrup (4 km) Gisserbaek (4 km) Boddum (5 km) Gundtoft (6 km) Ydby (6 km) Flarup (6 km) Gundtoft-Gettrup (7 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Thisted (Nordjylland) : 360.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 October 2017 |
||