Wind farms
Lyby (Denmark)| Lyby (Denmark) |
|
| Operational (0,225 MW) - Dismantled (0,45 MW) |

| Country | Denmark |
| County/Zone | Skive (Midtjylland) |
| City | Lyby |
| Wind farm type | Onshore wind farm |

![]() | 0.225 MW commissioned |
![]() | 0.225 MW commissioned |
![]() | 0.225 MW commissioned |
![]() | 0.225 MW decommissioned |
![]() | 0.225 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V27/225 (x 1) |
| Dismantled | Vestas V27/225 (x 2) |

![]() | |

| City | Lyby |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Dismantled (2014/06) |
| Coordinates | Latitude 56° 38' 11.7" - Longitude 9° 0' 39.7" |
| Precise localization | No |
| City | Lyby |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Dismantled (2015/05) |
| Coordinates | Latitude 56° 38' 11.7" - Longitude 9° 0' 39.7" |
| Precise localization | No |
| City | Lyby |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Operational |
| Coordinates | Latitude 56° 38' 11.7" - Longitude 9° 0' 39.7" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Bostrup (Skive) (2 km) Hindborg (4 km) Gronning (4 km) Dolby (4 km) Oddense (5 km) Resen (Skive) (5 km) Jebjerg (5 km) Hem (DK) (6 km) Gert Marcussen Viumvej Roslev (7 km) Jens Jepsen Jorgens Roslev (7 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Skive (Midtjylland) : 139.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||