Wind farms
Dolby (Denmark)| Dolby (Denmark) |
|
| Dismantled (0,46 MW) |

| Country | Denmark |
| County/Zone | Skive (Midtjylland) |
| City | Dolby |
| Wind farm type | Onshore wind farm |

![]() | 0.2 MW commissioned |
![]() | 0.13 MW commissioned |
![]() | 0.13 MW commissioned |
![]() | 0.13 MW decommissioned |
![]() | 0.13 MW decommissioned |
![]() | 0.2 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Dismantled | Windmatic WM20S (x 2) |
| Dismantled | Vestas V25/200 (x 1) |

![]() | |

| City | Dolby |
| Commissioning | ![]() |
| Turbine | 1x Vestas V25/200 (power 200 kW, diameter 25 m) |
| Hub height | ![]() |
| Total nominal power | 200 kW |
| Status | Dismantled (2015/05) |
| Coordinates | Latitude 56° 36' 21.6" - Longitude 8° 58' 47.4" |
| Precise localization | No |
| City | Dolby |
| Commissioning | ![]() |
| Turbine | 1x Windmatic WM20S (power 130 kW, diameter 19.4 m) |
| Hub height | ![]() |
| Total nominal power | 130 kW |
| Status | Dismantled (2002/11) |
| Coordinates | Latitude 56° 36' 21.6" - Longitude 8° 58' 47.4" |
| Precise localization | No |
| City | Dolby |
| Commissioning | ![]() |
| Turbine | 1x Windmatic WM20S (power 130 kW, diameter 19.4 m) |
| Hub height | ![]() |
| Total nominal power | 130 kW |
| Status | Dismantled (2002/11) |
| Coordinates | Latitude 56° 36' 21.6" - Longitude 8° 58' 47.4" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hem (DK) (2 km) Hindborg (2 km) Resen (Skive) (3 km) Lyby (4 km) Brondum (Skive) (5 km) Hvidbjerg (Skive) (5 km) Oddense (6 km) Bostrup (Skive) (6 km) Balling (6 km) Gronning (7 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Skive (Midtjylland) : 139.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||