Wind farms
Mejlby (Aarhus) (Denmark)| Mejlby (Aarhus) (Denmark) |
|
| Operational (1,11 MW) |

| Country | Denmark |
| County/Zone | Aarhus (Midtjylland) |
| City | Mejlby |
| Wind farm type | Onshore wind farm |

![]() | 0.45 MW commissioned |
![]() | 0.66 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Bonus B24/150 (x 3) |
| Operational | Vestas V47/660 (x 1) |

![]() | |

| City | Mejlby |
| Commissioning | ![]() |
| Turbine | 1x Vestas V47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 660 kW |
| Status | Operational |
| Coordinates | Latitude 56° 18' 5.6" - Longitude 10° 12' 41.7" |
| Precise localization | No |
| City | Mejlby |
| Commissioning | ![]() |
| Turbines | 3x Bonus B24/150 (power 150 kW, diameter 24 m) |
| Hub height | ![]() |
| Total nominal power | 450 kW |
| Status | Operational |
| Coordinates | Latitude 56° 18' 5.6" - Longitude 10° 12' 41.7" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Kalstrup - Mejlby (0 km) Harup (2 km) Roved (3 km) Todbjerg (4 km) Bendstrup (4 km) Sporring (4 km) Halling (4 km) Astrup (Favrskov) (5 km) Odum (5 km) Hesselballe (Aarhus) (5 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Aarhus (Midtjylland) : 12.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 23 May 2019 |
||